ECHBP

Descriptif Des Travaux :

  • Démolition boutique et 02 lavages.
  • Construction clôture pour station.
  • Remise en état terrain.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.

Lieu : NASRALLAH

Année d’exécution : 2023

Client : TotalEnergies SS Route LA MARSA

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare