Description of Works:
- Concrete sawing works 20 cm on each side of the expansion joint.
- Loose concrete demolition works.
- Casting with SikaGrout 234.
- Installation of SJKAFLEX 11 FC sealant.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.
Place : MARSA GP9
Year of execution: 2023
Customer: TotalEnergies Station-Service sur la Route La Marsa GP9