





Description of Works:
- Raising of parapet walls in reinforced concrete for the school roof.
- Construction of technical room.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.
Place: LAC
Year of execution: 2023
Customer: TotalEnergies