Description of Works:

  • Stripping of the asphalt track including removal of debris to the public dump.
  • Surface leveling.
  • Impregnation of base layer.
  • Execution of an area paved with asphalt concrete (bituminous concrete).
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.

Place : ELJAM and BORGINE

Year of execution: 2023

Customer: TotalEnergies SS on A1 Highway ELBORGINE and ALJAM.