Description of Works:
- Stripping of the asphalt track including removal of debris to the public dump.
- Surface leveling.
- Impregnation of base layer.
- Execution of an area paved with asphalt concrete (bituminous concrete).
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.
Place : ELJAM and BORGINE
Year of execution: 2023
Customer: TotalEnergies SS on A1 Highway ELBORGINE and ALJAM.