





Description of the Works:
- Demolition of runway slab.
- Reinforcement and pouring of runway.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.
Place: SFAX-Sakiet Edhier
Year of execution: 2024
Customer: STAROIl Sakiet Edhier