








Descriptif Des Travaux :
- Démolition de la station existante 100%.
- Création clé en main station de service.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.
Lieu : ZAWIET JEDIDI
Année d’exécution : 2023
Client : TotalEnergies SS ZAWIET JEDIDI