ECHBP

Descriptif Des Travaux :

  • Démolition dallage piste.
  • Fabrication et montage box pompiste.
  • Ferraillage et coulage piste.
  • Construction baie de vidange.
In integrating non-aligned structures into existing legacy systems, a holistic gateway blueprint is a backward compatible packaging tangible of immeasurable strategic value in right-sizing conceptual frameworks when thinking outside the box.

Projet :Travaux de refection de SS TotalEnergies MARETH

Lieu : MARETH

Année d’exécution : 2023

Client : TotalEnergies SS MERETH

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare